Sydney F2F component for ‘Battery Storage Systems’ Install Only
- Event Dates
- Wed 6/1
- Event name 122 Hume Highway in Chullora
- https://www.gses.com.au/event/f2f-component-for-ba
-
TheBattery Storage Systems for Grid-Connected PV Systems Install Onlycourse consists of two main components: online theory completed at students own pace and the face-to-face (3 days) component held at NECA Training, 122 Hume Highway, Chullora NSW 2190. Students can only book their place at the face-to-face component after completing 60% of the online assessment (indicative […]